Home About WM Plant Hire Excavator Fleet Dredging Quarrying Slope Stabilisation Ground Remediation Specialist Civils Case Studies Latest News Contact Us
Ground Stabilisation
WM Plant Hire
 

Our long reach excavators are ideally suited to remediation and reclamation contracts.  Underground obstructions such as gas storage tanks, steel or brickwork chambers can be removed at safe working distances.  Deep insitu excavation of contaminated material can be carried out for soil mixing and treatment.

Recent Projects:

  • Removal of contaminated material from lagoon, Staffordshire
  • Reclamation of obstructions and underground culverts on A500, Staffordshire
  • Removal of underground storage tanks up to 50 metre diameter, Birmingham
  • Slurry cut-off walls for waste facility, London
  • Grading and excavation of batters for Waste Landfill Facility, Northants
  • Demolition of river bridge structure on M60, Manchester
  • Excavation of deep basement inside bored piles, Birmingham
  •  
    Click to enlarge

    ©2007 WM Plant Hire