A huge cofferdam under construction for Severn Trent Water, over 200 meters long, 22 metres across and 18 metres deep, has involved precision excavation between temporary shoring. The CAT 375 with a 29 metres reach is able to excavate to the required depth with access available from one side only and load the spoil directly into dumpers.