With wet winter weather and concerns about landslips on the West of England Mainline urgent maintenance works were carried out by contractors at Crewkerne including excavation of counterfort drains using WM Plant Hire’s impressive 30m CAT long reach machine. This extra reach was required given the awkward site location over a tunnel.
See p.204-205 in the Rail Professional Supply Chain Directory 2022 for a summary of our work in rail and benefits of long reach.
Or for more information on our work in Rail 2021 watch our new video below.