Using the powerful 20m CAT 352 working with Breedon WM Plant Hire supported the works at Arnish Point, Stornoway which required the placement of 2 to 5 tonne rock to strengthen the toe and patch repair existing rock armour revetments.
Using the powerful 20m CAT 352 working with Breedon WM Plant Hire supported the works at Arnish Point, Stornoway which required the placement of 2 to 5 tonne rock to strengthen the toe and patch repair existing rock armour revetments.