As part of an upgrade at a sewage treatment works in Walsall Wood a long reach was required for some underwater deep excavation works in a shaft requiring a breaker.
70 tonne excavator with 25m reach used to remove several thousand tonnes of material for Staffordshire ERF
Construction of the massive Cross Rail Project in London required a number of deep excavations for tunnelling equipment and the new stations. At Tottenham Court Road WM Plant Hire provided their 65 tonne excavator with 24m reach. The machine was selected for its high production and efficiency.