The removal of underwater obstructions was a critical operation to ensure that the piling works were not delayed at Liverpool2 port development.
WM Plant Hire involved in massive development in Canary Wharf that will maximise the space available in the heart of London by reclaiming water filled docks.
Our long reach CAT349E assists in the installation of piles on river with limited access for standard reach machines.
WM Plant Hire assist McLaughlin & Harvey in major expansion of the harbour at Invergordon, Scotland.